03-12-1999 12:53AM FROM S4C INC DOOLEY Service CORP., INC. P.O. BOX 2036 BOERNE, TEXAS 78006 Phone 830-816-3019 Fox 850-816-2822 March 8, 1999 Mr. William R. Hayward 609 Oak Meadows San Marcos, TX 78666 Dear Mr. Hayward: We wish to submit the following installing and supplying new Our Bid for This Project is: Dispensers Monitor Tanks $ 91,340.00 (4)- Bill acceptor-Add $5,558.00 ea +20% $ 26,680.00 Removal of Existing Fuel Equipment, Canopy $ 31,223.00 Supply & install new canopy, new building facia And all other related items as listed in scope of work $176,409.00 GRAND TOTAL AMOUNT (Plus any applicable taxes) $325,652.00 Thank you for allowing us to bid on your project. If you have any questions,
please call. Sincerely, Bill Pagani Attachments, Exhibit I, Equipment Supplied Exhibit II, Scope of Work Exhibit III.-Exclusions:: EXHIBIT I Fuel Equipment Furnished (3) Wayne V590D)4GQUY - Two hose blenders w/Card Reader, Phase II Vapor Piping, Graphic Display, Intercom Speaker and for Lighted Valance (1) Wayne V395D4GUY Same as above except with Diesel (10) Dayco 5/8".x 10"Dispenser Hoses (10) EBW: 3/4" Safety Break-A-Way Whip Hose (8) OPW 11AP Auto Nozzles (2) OPW 11A Auto Nozzles (10) Husky 3/4" Hose Swivels (1) I Tank Gauge System w/Electronic Leak Detection (11) Tank Le Level Probes (3) Probe Hangers (3) Line Le Detectors (3) Probe Caps (1) Ruby Verifone Verifone 65 Reg. P.O.S. System for Coastal Include 1 year Ruby help desk. (1) Wayne Interface to Ruby Verifone (1) 20,000 gallon split 8/12 Double Wall (1) 8,000 gallon Diesel Double Wall TOTAL $91,340,00 (3) Bill acceptors for dispensers - $5,558.00 each ordered with dispenser, plus 20%. TOTAL ,$26,680.00 EXHIBIT II
Scope Of Work: Removal: Tear down existing canopy & dispose of Remove 3 tanks, dispensers and lines, haul off Closure Reports TOTAL $31,223.00 Install: 1- 20,000 gallon split 1- 8,000 gallon diesel w/deadman-turn buckles I - 24'x 128' canopy (Furnished by Fuel Co 8 - Canopy footings Haul off spoils, tank hole & pipe chase: Select fill for tank hole & pipe chase new Furnish & Install Risers Pipe fuel lines & all fuel related equipment Paint canopy columns Intercom Misc, angle iron Crane Line & tank test Equipment, backhoe, trackhoe, bobcat Superintendent Fuel Crew Permits (fuel related only) Barricades (fuel construction only) Tool Vault (fuel construction only) Dumpster (fuel construction only) Porta Potty (fuel construction only) Start-Up (Fuel Equip.) Total $176,409.00 Building Facia on, four sides 36" -36'6"x66' Building Coastal. To be installed over smooth block or plywood, that's installed by General Contractor.. GRAND TOTAL $325,652.00 EXHIBIT III EXCLUSIONS: Concrete Electrical Rock/Water/Cave-Ins. Contaminated Soils Soil test other than for closure report No air water stand No plumbing Island forms |