BUSINESS AND FINANCIAL PLAN FOR A GAS STATION AND CONVENIENCE STORE (C-STORE) E-Mail is lulusostrich@sanmarcos.net

 

 

03-12-1999 12:53AM FROM S4C INC

DOOLEY Service CORP., INC.

P.O. BOX 2036

BOERNE, TEXAS 78006

Phone 830-816-3019

Fox 850-816-2822

March 8, 1999

Mr. William R. Hayward

609 Oak Meadows

San Marcos, TX 78666

Dear Mr. Hayward:

We wish to submit the following installing and supplying new

Our Bid for This Project is:

Dispensers Monitor Tanks $ 91,340.00

(4)- Bill acceptor-Add $5,558.00 ea +20% $ 26,680.00

Removal of Existing Fuel Equipment, Canopy $ 31,223.00

Supply & install new canopy, new building facia

And all other related items as listed in scope of work $176,409.00

GRAND TOTAL AMOUNT (Plus any applicable taxes) $325,652.00

Thank you for allowing us to bid on your project. If you have any questions, please call.

Sincerely,

Bill Pagani

Attachments,

Exhibit I, Equipment Supplied

Exhibit II, Scope of Work

Exhibit III.-Exclusions::

EXHIBIT I

Fuel Equipment Furnished

(3) Wayne V590D)4GQUY - Two hose blenders w/Card Reader,

Phase II Vapor Piping, Graphic Display, Intercom Speaker and for Lighted Valance

(1) Wayne V395D4GUY Same as above except with Diesel

(10) Dayco 5/8".x 10"Dispenser Hoses

(10) EBW: 3/4" Safety Break-A-Way Whip Hose

(8) OPW 11AP Auto Nozzles

(2) OPW 11A Auto Nozzles

(10) Husky 3/4" Hose Swivels

(1) I Tank Gauge System w/Electronic Leak Detection

(11) Tank Le Level Probes

(3) Probe Hangers

(3) Line Le Detectors

(3) Probe Caps

(1) Ruby Verifone Verifone 65 Reg. P.O.S. System for Coastal

Include 1 year Ruby help desk.

(1) Wayne Interface to Ruby Verifone

(1) 20,000 gallon split 8/12 Double Wall

(1) 8,000 gallon Diesel Double Wall

TOTAL $91,340,00

(3) Bill acceptors for dispensers - $5,558.00 each ordered with dispenser, plus 20%.

TOTAL ,$26,680.00

EXHIBIT II

 

Scope Of Work:

Removal: Tear down existing canopy & dispose of

Remove 3 tanks, dispensers and lines, haul off

Closure Reports

TOTAL $31,223.00



Install: 1- 20,000 gallon split

1- 8,000 gallon diesel w/deadman-turn buckles

I - 24'x 128' canopy (Furnished by Fuel Co

8 - Canopy footings

Haul off spoils, tank hole & pipe chase:

Select fill for tank hole & pipe chase new

Furnish & Install Risers

Pipe fuel lines & all fuel related equipment

Paint canopy columns

Intercom

Misc, angle iron

Crane

Line & tank test

Equipment, backhoe, trackhoe, bobcat

Superintendent

Fuel Crew

Permits (fuel related only)

Barricades (fuel construction only)

Tool Vault (fuel construction only)

Dumpster (fuel construction only)

Porta Potty (fuel construction only)

Start-Up (Fuel Equip.)

Total $176,409.00

Building Facia on, four sides 36" -36'6"x66' Building Coastal.

To be installed over smooth block or plywood, that's installed by General Contractor..

GRAND TOTAL $325,652.00









EXHIBIT III

EXCLUSIONS:

Concrete

Electrical

Rock/Water/Cave-Ins.

Contaminated Soils

Soil test other than for closure report

No air water stand

No plumbing

Island forms